Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
Jul 21, 2026 - 12:15 AEST
Jul 21, 2026 - 12:15 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jul 13, 2026 - 06:00 AEST
Jul 13, 2026 - 06:00 AEST
Scheduled - Access to four car parks adjacent to Building E and the Telstra tower at Dandenong campus will be restricted from 6:00am Monday 13 July to 6:00pm Sunday 8 August to allow for scheduled maintenance works. To ensure your safety, please follow all signage in the area.
Jul 13, 2026 06:00 - Aug 8, 2026 18:00 AEST
Jul 13, 2026 06:00 - Aug 8, 2026 18:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 12, 2026 - 06:00 AEST
Jun 12, 2026 - 06:00 AEST
Scheduled - Construction works will be undertaken in Building K at Frankston campus from 6:00am Friday 12 June to 5:00pm Monday 3 August. This project may generate some construction noise at times.
Jun 12, 2026 06:00 - Aug 3, 2026 17:00 AEST
Jun 12, 2026 06:00 - Aug 3, 2026 17:00 AEST
Investigating - ITS are currently investigating reports of MarkBook and STRATA application issues. Some users are unable to access the system or may experience slow performance.
We will provide an update as soon as more information is available.
Mar 17, 2026 - 10:14 AEDT
We will provide an update as soon as more information is available.
Mar 17, 2026 - 10:14 AEDT
About This Site
Our facilities and systems are continuously monitored for impacts and outages. Should there be any interruptions in service, we'll provide status updates here.
Facilities
Operational
Bass Coast
Operational
Berwick
Operational
Cerberus
Operational
Chisholm @311
Operational
Cranbourne
Operational
Dandenong
Operational
Frankston
Operational
Lonsdale Street
Operational
Mornington Peninsula
Operational
Springvale
Operational
Systems
Degraded Performance
Archibus
Operational
Azure
Operational
Celcat
Operational
Celcat Live
Operational
Chris21
Operational
CRM
Operational
Desktop
Operational
Device - DELL Laptop
Operational
Email Services
Operational
Finance One
Operational
GeneSys Cloud
Operational
HR Kiosk
Operational
iChris
Operational
Internet
Operational
Intranet
Operational
LAN
Operational
LivePro Knowledge-base
Operational
Markbook
Degraded Performance
Microsoft365
Operational
Moodle
Operational
Moodle Middleware
Operational
MS Stream Classic
Operational
MSTeams
Operational
MyChisholm
Operational
Paytime
Operational
PDRP
Operational
Phones
Operational
Printing Services
Operational
QMS
Operational
Security System
Operational
ServiceNow
Operational
Single Sign On (SSO)
Operational
Sirsi Dynix
Operational
Software Centre
Operational
Strata
Degraded Performance
TRIM
Operational
vPermit
Operational
VPN
Operational
WAN
Operational
WEB Site
Operational
Zoom
Operational
Projects
Operational
Frankston Defence and Apprenticeship Centre
Operational
Frankston Redevelopment Project Stage 2
Operational
Frankston Redevelopment Project Stage 3
Operational
Frankston Tech School
Operational
Dandenong Building J Demolition
Operational
Dandenong new car park
Operational
Dandenong Re-Stack Project
Operational
Dandenong Tech School
Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.
Scheduled Maintenance
TEST & TAGGING [BASS COAST] Jul 31, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Bass Coast campus from 7:00am to 4:00pm Friday 31 July. Contractors will be making their way through Buildings A, B, C and F during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:35 AEST
Posted on Jul 29, 2026 - 08:35 AEST
TEST & TAGGING - DA-A, B, C, D, E & F [DANDENONG] Aug 3, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Monday 3 August. Contractors will be making their way through Buildings A, B, C, D, E and F during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:43 AEST
Posted on Jul 29, 2026 - 08:43 AEST
TEST & TAGGING - DA-G [DANDENONG] Aug 4, 2026 07:00-15:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 3:00pm Tuesday 4 August. Contractors will be making their way through Building G during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:44 AEST
Posted on Jul 29, 2026 - 08:44 AEST
TEST & TAGGING - DA-K [DANDENONG] Aug 5, 2026 07:00-15:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Wednesday 5 August. Contractors will be making their way through Building K during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:46 AEST
Posted on Jul 29, 2026 - 08:46 AEST
TEST & TAGGING - DA-R [DANDENONG] Aug 6, 2026 07:00 - Aug 7, 2026 18:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus 7:00am to 4:00pm Thursday 6 August and Friday 7 August. Contractors will be making their way through Building R during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:49 AEST
Posted on Jul 29, 2026 - 08:49 AEST
TEST & TAGGING [SPRINGVALE] Aug 7, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Springvale campus from 7:00am to 4:00pm Friday 7 August. Contractors will be making their way through the building during this time. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:37 AEST
Posted on Jul 29, 2026 - 08:37 AEST
TEST & TAGGING [SKILLS & JOBS CENTRE] Aug 7, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at the Skills & Jobs Centre between 7:00am to 4:00pm Friday 7 August. Contractors will be making their way through the building during this time. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:40 AEST
Posted on Jul 29, 2026 - 08:40 AEST
TEST & TAGGING - DA-M, N, PT1, PT3, W & Y [DANDENONG] Aug 10, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Monday 10 August. Contractors will be making their way through Buildings M, N, PT1, PT3, W and Y during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:50 AEST
Posted on Jul 29, 2026 - 08:50 AEST
TEST & TAGGING - DA-L [DANDENONG] Aug 11, 2026 07:00 - Aug 12, 2026 17:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Tuesday 11 August and Wednesday 12 August. Contractors will be making their way through Building L during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 08:54 AEST
Posted on Jul 29, 2026 - 08:54 AEST
TEST & TAGGING - DA-P [DANDENONG] Aug 13, 2026 07:00 - Aug 17, 2026 16:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Thursday 13, Friday 14 and Monday 17 August. Contractors will be making their way through Building P during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:00 AEST
Posted on Jul 29, 2026 - 09:00 AEST
TEST & TAGGING - DA-T [DANDENONG] Aug 18, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Tuesday 18 August. Contractors will be making their way through Building T during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:02 AEST
Posted on Jul 29, 2026 - 09:02 AEST
TEST & TAGGING - DA-V [DANDENONG] Aug 19, 2026 07:00 - Aug 20, 2026 17:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Wednesday 19 and Thursday 20 August. Contractors will be making their way through Building V during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:03 AEST
Posted on Jul 29, 2026 - 09:03 AEST
TEST & TAGGING - DA-U [DANDENONG] Aug 21, 2026 07:00 - Aug 24, 2026 16:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Friday 21 August and Monday 24 August. Contractors will be making their way through Building U during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:05 AEST
Posted on Jul 29, 2026 - 09:05 AEST
TEST & TAGGING - DA-W [DANDENONG] Aug 25, 2026 07:00 - Aug 27, 2026 16:00 AEST
Electrical Test and Tagging will be undertaken at Dandenong campus from 7:00am to 4:00pm Tuesday 25 August to Thursday 27 August. Contractors will be making their way through Building W during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:09 AEST
Posted on Jul 29, 2026 - 09:09 AEST
TEST & TAGGING - BE-A, C, D, F & H [BERWICK] Aug 31, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Monday 31 August. Contractors will be making their way through Buildings A, C, D, F and H during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:11 AEST
Posted on Jul 29, 2026 - 09:11 AEST
TEST & TAGGING - BE-A Sep 1, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Tuesday 1 September. Contractors will be making their way through Building A during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:12 AEST
Posted on Jul 29, 2026 - 09:12 AEST
TEST & TAGGING - BE-E [BERWICK] Sep 2, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Wednesday 2 September. Contractors will be making their way through Building E during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:13 AEST
Posted on Jul 29, 2026 - 09:13 AEST
TEST & TAGGING - BE-J [BERWICK] Sep 3, 2026 07:00 - Sep 4, 2026 17:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Thursday 3 and Friday 4 September. Contractors will be making their way through Building J during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:14 AEST
Posted on Jul 29, 2026 - 09:14 AEST
TEST & TAGGING - BE-K [BERWICK] Sep 7, 2026 07:00 - Sep 8, 2026 17:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Monday 7 and Tuesday 8 September. Contractors will be making their way through Building K during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:15 AEST
Posted on Jul 29, 2026 - 09:15 AEST
TEST & TAGGING - BE-L [BERWICK] Sep 9, 2026 07:00 - Sep 14, 2026 16:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Wednesday 9, Thursday 10, Friday 11 and Monday 14 September. Contractors will be making their way through Building L during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:17 AEST
Posted on Jul 29, 2026 - 09:17 AEST
TEST & TAGGING - BE-B [BERWICK] Sep 15, 2026 07:00 - Sep 16, 2026 17:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Thursday 15 and Friday 16 September. Contractors will be making their way through Building B during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:18 AEST
Posted on Jul 29, 2026 - 09:18 AEST
TEST & TAGGING - BE-G [BERWICK] Sep 17, 2026 07:00 - Sep 18, 2026 17:00 AEST
Electrical Test and Tagging will be undertaken at Berwick campus from 7:00am to 4:00pm Thursday 17 and Friday 18 September. Contractors will be making their way through Building G during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:20 AEST
Posted on Jul 29, 2026 - 09:20 AEST
NO ACCESS - CAR PARK CENTRAL TO DA-E, DA-T & DA-V [DANDENONG] Sep 19, 2026 06:00 - Oct 4, 2026 18:00 AEDT
Access to the car park central to Buildings E, T and V at Dandenong campus will be unavailable from 6:00am Saturday 19 September to 5:00pm Sunday 4 October to allow for Telstra tower scheduled works. There will be heavy vehicles in the area and changes to pedestrian access. Follow all signage to ensure your safety.
Posted on Jun 01, 2026 - 10:01 AEST
Posted on Jun 01, 2026 - 10:01 AEST
TEST & TAGGING - CR-B, C, D, E & NURSERY [CRANBOURNE] Sep 21, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Cranbourne campus from 7:00am to 4:00pm Monday 21 September. Contractors will be making their way through Buildings B, C, D, E and the Nursery during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:22 AEST
Posted on Jul 29, 2026 - 09:22 AEST
TEST & TAGGING - CR-A [CRANBOURNE] Sep 22, 2026 07:00 - Sep 23, 2026 17:00 AEST
Electrical Test and Tagging will be undertaken at Cranbourne campus from 7:00am to 4:00pm Tuesday 22 and Wednesday 23 September. Contractors will be making their way through Building J during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:23 AEST
Posted on Jul 29, 2026 - 09:23 AEST
TEST & TAGGING - FR-A [FRANKSTON] Sep 28, 2026 07:00 - Oct 2, 2026 16:00 AEST
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Monday 28 September to Friday 2 October. Contractors will be making their way through Building A during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:26 AEST
Posted on Jul 29, 2026 - 09:26 AEST
TEST & TAGGING - FR-Y [FRANKSTON] Oct 2, 2026 07:00-16:00 AEST
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Friday 2 October. Contractors will be making their way through Building Y during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:27 AEST
Posted on Jul 29, 2026 - 09:27 AEST
TEST & TAGGING - FR-D [FRANKSTON] Oct 5, 2026 07:00 - Oct 6, 2026 17:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Monday 5 and Tuesday 6 October. Contractors will be making their way through Building D during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:28 AEST
Posted on Jul 29, 2026 - 09:28 AEST
TEST & TAGGING - FR-O, P1, P2 & Q [FRANKSTON] Oct 7, 2026 07:00-16:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Wednesday 7 October. Contractors will be making their way through Buildings O, P1, P2 and Q during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:30 AEST
Posted on Jul 29, 2026 - 09:30 AEST
TEST & TAGGING - FR-K [FRANKSTON] Oct 7, 2026 07:00 - Oct 8, 2026 17:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Wednesday 7 and Thursday 8 October. Contractors will be making their way through Building K during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:29 AEST
Posted on Jul 29, 2026 - 09:29 AEST
TEST & TAGGING - FR-C [FRANKSTON] Oct 8, 2026 07:00 - Oct 9, 2026 17:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Thursday 8 and Friday 9 October. Contractors will be making their way through Building C during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:32 AEST
Posted on Jul 29, 2026 - 09:32 AEST
TEST & TAGGING - FR-B [FRANKSTON] Oct 12, 2026 07:00 - Oct 15, 2026 16:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Monday 12 October to Thursday 15 October. Contractors will be making their way through Building B during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:33 AEST
Posted on Jul 29, 2026 - 09:33 AEST
TEST & TAGGING - FR-J & R [FRANKSTON] Oct 16, 2026 07:00-16:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Friday 16 October. Contractors will be making their way through Buildings J and R during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:34 AEST
Posted on Jul 29, 2026 - 09:34 AEST
TEST & TAGGING - FR-L, S & T [FRANKSTON] Oct 20, 2026 07:00-16:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Tuesday 20 October. Contractors will be making their way through Buildings L, S and T during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:35 AEST
Posted on Jul 29, 2026 - 09:35 AEST
TEST & TAGGING - FR-W [FRANKSTON] Oct 21, 2026 07:00 - Oct 26, 2026 16:00 AEDT
Electrical Test and Tagging will be undertaken at Frankston campus from 7:00am to 4:00pm Wednesday 21 to Friday 23 and Monday 26 October. Contractors will be making their way through Building W during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:41 AEST
Posted on Jul 29, 2026 - 09:41 AEST
TEST & TAGGING - MP-A, C, D, E & J [MORNINGTON PENINSULA] Oct 29, 2026 07:00-16:00 AEDT
Electrical Test and Tagging will be undertaken at Mornington Peninsula campus from 7:00am to 4:00pm Thursday 29 October. Contractors will be making their way through Buildings A, C, D, E and J during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:43 AEST
Posted on Jul 29, 2026 - 09:43 AEST
TEST & TAGGING - MP-G, LIBRARY & RECEPTION [MORNINGTON PENINSULA] Oct 30, 2026 07:00-16:00 AEDT
Electrical Test and Tagging will be undertaken at Mornington Peninsula campus from 7:00am to 4:00pm Friday 30 October. Contractors will be making their way through Building G, the Building A Library and Reception areas during this period. There may be minor interruptions caused as each appliance is tested.
Posted on Jul 29, 2026 - 09:45 AEST
Posted on Jul 29, 2026 - 09:45 AEST