Investigating - The water supply to Bass Coast campus has been interrupted. The ETA for water to be restored is Monday 20 October. Updates will be provided once further information is known.
Oct 17, 2025 - 15:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 17, 2025 - 06:00 AEDT
Scheduled - Access to the Central car park at Dandenong campus will be unavailable from 6:00am Friday 17 October to 10:00am Monday 20 October to allow for scheduled maintenance works.
Oct 17, 2025 06:00 - Oct 20, 2025 10:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 13, 2025 - 07:30 AEDT
Scheduled - Electrical Switchboard testing will be undertaken at Dandenong Campus from 7:30am to 4:00pm, Monday 13th to Monday 20th October. Contractors will be making their way through the campus during this period, there will be no power interruptions caused as each board is tested.
Oct 13, 2025 07:30 - Oct 20, 2025 16:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 13, 2025 - 06:00 AEDT
Scheduled - Due to ongoing construction works, pedestrian access and thoroughfares at Frankston campus will be temporarily altered from Monday 13 October to Friday 12 December.

To help ensure your safety, please follow the updated access routes and signage:
- Buildings A, B, C, D, J, K and L access via Oates Street, Quality Street and Fletcher Road
- Buildings O, Q, R, S, T, W, Y, P1 and P2 access via Kelso Street, Beach Street and Fletcher Road
Please note:
- Directional signage will be displayed in key areas
- Construction noise may occur at times
- Measures will be in place to minimise dust and debris throughout the works.

Oct 13, 2025 06:00 - Dec 12, 2025 16:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Sep 19, 2025 - 06:30 AEST
Update - We will be undergoing scheduled maintenance during this time.
Sep 19, 2025 06:30 - Oct 31, 2025 16:30 AEDT
Scheduled - Access to Room 102 in Building L at Frankton campus will be restricted from Monday to Friday, 6:30am Friday 19 September through to 3:00pm Friday 31 October. This temporary closure allows for the construction of the new multi-faith facilities.

The initial two weeks of construction will occur during the school holidays and may involve intermittent noise, dust and debris. Contractors have mitigation strategies in place and will be operating in a sealed area to help contain any airborne particles.

During the school term, construction activities will be limited to the use of power hand tools to minimise disruption.

If you have any questions about this Project, please contact: majorprojects@chisholm.edu.au.

Sep 19, 2025 06:30 - Oct 31, 2025 16:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jul 28, 2025 - 06:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jul 28, 2025 06:00 - Dec 27, 2025 09:00 AEDT
Scheduled - There will be NO ACCESS to the eastern end of the carpark adjacent to Stud Road from 6:00am Monday 28 July 2025 until July 2026 due to the construction of the Dandenong Tech School.
To ensure your safety, please follow all signage and traffic management in the area as changes to thoroughfares and road access have been implemented.

Jul 28, 2025 06:00 - Dec 27, 2025 09:00 AEDT

About This Site

Our facilities and systems are continuously monitored for impacts and outages. Should there be any interruptions in service, we'll provide status updates here.

Facilities Under Maintenance
90 days ago
100.0 % uptime
Today
Bass Coast ? Under Maintenance
Berwick ? Operational
Cerberus Operational
90 days ago
100.0 % uptime
Today
Chisholm @311 ? Operational
Cranbourne ? Operational
Dandenong ? Under Maintenance
Frankston ? Under Maintenance
Lonsdale Street ? Operational
Mornington Peninsula ? Operational
Springvale ? Operational
Systems Operational
90 days ago
100.0 % uptime
Today
Archibus ? Operational
Azure Operational
Celcat Operational
Celcat Live Operational
Chris21 Operational
CRM ? Operational
Desktop Operational
Email Services Operational
Finance One Operational
HR Kiosk Operational
iChris Operational
Internet Operational
Intranet Operational
LAN Operational
LivePro Knowledge-base Operational
Markbook Operational
Microsoft365 Operational
Moodle Operational
Moodle Middleware Operational
MS Stream Classic Operational
MSTeams Operational
MyChisholm Operational
Paytime Operational
PDRP Operational
Phones Operational
Printing Services Operational
QMS Operational
Security System ? Operational
90 days ago
100.0 % uptime
Today
ServiceNow ? Operational
Single Sign On (SSO) Operational
90 days ago
100.0 % uptime
Today
Sirsi Dynix Operational
Software Centre Operational
Strata Operational
TRIM Operational
vPermit ? Operational
90 days ago
100.0 % uptime
Today
VPN Operational
WAN Operational
WEB Site ? Operational
Zoom ? Operational
Projects Under Maintenance
90 days ago
100.0 % uptime
Today
Frankston Defence and Apprenticeship Centre Operational
90 days ago
100.0 % uptime
Today
Frankston Redevelopment Project Stage 2 Operational
Frankston Redevelopment Project Stage 3 ? Under Maintenance
Frankston Tech School ? Operational
90 days ago
100.0 % uptime
Today
Dandenong Building J Demolition ? Operational
90 days ago
100.0 % uptime
Today
Dandenong new car park Under Maintenance
90 days ago
100.0 % uptime
Today
Dandenong Re-Stack Project ? Operational
90 days ago
100.0 % uptime
Today
Dandenong Tech School ? Operational
90 days ago
100.0 % uptime
Today
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.

Scheduled Maintenance

ELECTRICAL SWITCHBOARD TESTING [FRANKSTON] Nov 3, 2025 07:30 - Nov 14, 2025 16:00 AEDT

Electrical Switchboard testing will be undertaken at Frankston Campus from 7:30am to 4:00pm, Monday 3rd to Friday 14th November. Contractors will be making their way through the campus during this period, there will be no power interruptions caused as each board is tested.
Posted on Jul 07, 2025 - 09:59 AEST

EVACUATION DRILL - SKILLS & JOBS CENTRE [DANDENONG] Nov 5, 2025 09:30-09:45 AEDT

An evacuation drill will be undertaken in the Skills & Jobs Centre between 9:30am and 9:45am Wednesday 5 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
Posted on Oct 07, 2025 - 10:50 AEDT

EVACUATION DRILL - SPRINGVALE CAMPUS [SPRINGVALE] Nov 5, 2025 10:15-11:30 AEDT

Evacuation drills will be undertaken in at Springvale campus between 10:15am and 10:30am Wednesday 5 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
Posted on Oct 07, 2025 - 10:52 AEDT

EVACUATION DRILLS - DA-H, DA-N, DA-T, DA-R, DA-S, DA-V & DA-W [DANDENONG] Nov 5, 2025 10:40-12:40 AEDT

Evacuation drills will be undertaken in Buildings H, N, T, R, S, V and W, at Dandenong campus between 10:40am and 12:40am Wednesday 5 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
To view specific times for each building, please refer to the Intranet.

Posted on Oct 07, 2025 - 11:05 AEDT

EVACUATION DRILLS - BUILDINGS A, B, C, D, E, F, G, K, L, P, PT1, PT3, U, Y & Z [DANDENONG] Nov 7, 2025 09:00-15:00 AEDT

Evacuation drills will be undertaken in Buildings A, B, C, D, E, F, G, K, L, P, PT1, PT3, U, Y and Z at Dandenong campus between 9:00am and 3:00pm Friday 7 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
To view specific times for each building, please refer to the Intranet.

Posted on Oct 07, 2025 - 11:09 AEDT

EVACUATION DRILLS - FR-A, B, C, D, F, J, K, L, R, T & W [FRANKSTON] Nov 12, 2025 09:00-15:00 AEDT

Evacuation drills will be undertaken in Buildings A, B, C, D, F, J, K, L, R, T and W at Frankston campus between 9:00am and 3:00pm Wednesday 12 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
To view specific times for each building, please refer to the Intranet.

Posted on Oct 07, 2025 - 11:12 AEDT

EVACUATION DRILLS - BE-A, B, C, E, F, G, H, J, K & L [BERWICK] Nov 14, 2025 09:00-12:30 AEDT

Evacuation drills will be undertaken in Buildings A, B, C, E, F, G, H, J, K and L at Berwick campus between 9:00am and 12:30pm Friday 14 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
To view specific times for each building, please refer to the Intranet.

Posted on Oct 07, 2025 - 12:15 AEDT

EVACUATION DRILLS - CR-A, B, C, D & E [CRANBOURNE] Nov 19, 2025 09:00-10:30 AEDT

Evacuation drills will be undertaken in Buildings A, B, C, D and E at Cranbourne campus between 9:00am and 10:30am Wednesday 19 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
To view specific times for each building, please refer to the Intranet.

Posted on Oct 07, 2025 - 12:17 AEDT

EVACUATION DRILLS - BC-A [BASS COAST] Nov 21, 2025 09:00-10:00 AEDT

Evacuation drills will be undertaken in Building A at Bass Coast campus between 9:00am and 9:30am Friday 21 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
To view specific times for each building, please refer to the Intranet.

Posted on Oct 07, 2025 - 12:20 AEDT

EVACUATION DRILLS - MP-A, B & G [MORNINGTON PENINSULA] Nov 21, 2025 13:00-14:00 AEDT

Evacuation drills will be undertaken in Buildings A, B and G at Mornington Peninsula campus between 1:00pm and 2:00pm Friday 21 November. Audible times and announcements will be generated during the evacuation drills. All staff, students and visitors are expected to participate and follow the directions of the Emergency Wardens.
To view specific times for each building, please refer to the Intranet.

Posted on Oct 07, 2025 - 12:22 AEDT
Oct 19, 2025

No incidents reported today.

Oct 18, 2025

No incidents reported.

Oct 17, 2025
Completed - The scheduled maintenance has been completed.
Oct 17, 16:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 14, 12:30 AEDT
Scheduled - Planned maintenance on the Chisholm website has been scheduled for 12:30pm Tuesday 14 October to 5:00pm Friday 17 October. We do not anticipate any outages during this maintenance window, however some users may experience degraded or interrupted service for a short period.
Oct 14, 12:12 AEDT
Completed - The scheduled maintenance has been completed.
Oct 17, 15:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 17, 07:00 AEDT
Scheduled - Electrical Test and Tagging will be undertaken in Building G, the Comms Rooms, Library and Reception at Mornington Peninsula campus from 7:00am to 3:30pm, Friday 17 October. Contractors will be making their way through the buildings during this period, there may be minor interruptions caused as each appliance is tested.
Jul 28, 13:02 AEST
Resolved - This incident has been resolved. Printing services at Dandenong campus have been restored.
Oct 17, 09:15 AEDT
Investigating - Printing services at Dandenong campus are currently unavailable. ITS are investigating the issue. Further updates will be provided when additional information is known.
Oct 17, 08:40 AEDT
Oct 16, 2025
Completed - The scheduled maintenance has been completed.
Oct 16, 15:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 16, 07:00 AEDT
Scheduled - Electrical Test and Tagging will be undertaken in Buildings A, C, D, E and J at Mornington Peninsula campus from 7:00am to 3:30pm, Thursday 16 October. Contractors will be making their way through the buildings during this period, there may be minor interruptions caused as each appliance is tested.
Jul 28, 12:57 AEST
Oct 15, 2025

No incidents reported.

Oct 14, 2025
Oct 13, 2025

Unresolved incidents: ELECTRICAL SWITCHBOARD TESTING [DANDENONG], CHANGES TO PEDESTRIAN ACCESS [FRANKSTON].

Oct 12, 2025

No incidents reported.

Oct 11, 2025
Completed - The scheduled maintenance has been completed.
Oct 11, 16:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 9, 07:00 AEDT
Scheduled - Access to the new Central car park at Dandenong campus will be unavailable from 7:00am Thursday 9 October to 4:00pm Saturday 11 October to allow for light installation and cabling works. There will be NO ACCESS to the car park during this time.
Oct 3, 08:24 AEST
Completed - The scheduled maintenance has been completed.
Oct 11, 16:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 11, 07:00 AEDT
Scheduled - The power supply to Building K at Dandenong campus will be interrupted from 7:00am to 4:00pm Saturday 11 October to allow for scheduled maintenance works. There will be NO ACCESS to Building K during this time.
Oct 3, 08:17 AEST
Completed - The scheduled maintenance has been completed.
Oct 11, 16:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 11, 07:00 AEDT
Scheduled - The power supply to Building C at Dandenong campus will be interrupted from 7:00am to 4:00pm Saturday 11 October to allow for scheduled maintenance works. There will be NO ACCESS to Building C during this time.
Oct 3, 08:12 AEST
Oct 10, 2025
Completed - The scheduled maintenance has been completed.
Oct 10, 16:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 10, 07:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Oct 8, 12:53 AEDT
Scheduled - Access to walkways near the new Dandenong central car park site will be restricted on Friday 10 October between 7:00am to 4:00pm to allow for scheduled pathway repairs.
The following walkways will be closed:
- Pedestrian walkway adjacent to Building C and the Cafeteria courtyard
- Pedestrian walkway adjacent to Building K stairs
Please follow all directional signage in the area to ensure your safety.

Oct 10, 12:50 AEDT
Completed - The scheduled maintenance has been completed.
Oct 10, 16:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 10, 07:01 AEDT
Scheduled - Access to Building C at Dandenong campus will be restricted from 7:00am to 4:00pm Friday 10 October to allow for scheduled cabling installation. The Comms room, meeting rooms and thoroughfares will be impacted. Noise will occur during these works.
Oct 6, 09:10 AEDT
Oct 9, 2025
Resolved - This incident has been resolved.
Oct 9, 15:44 AEDT
Identified - A leaking water pipe within the construction site of the new central car park at Dandenong campus may result in a campus water outage in order to be repaired. Updates will be provided once further information is known.
Oct 9, 14:20 AEDT
Completed - The scheduled maintenance has been completed.
Oct 9, 03:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 8, 07:00 AEDT
Scheduled - Electrical Test and Tagging will be undertaken in Building W at Frankston campus from 7:00am to 3:30pm, Wednesday 8 October and Thursday 9 October. Contractors will be making their way through the building during this time, there may be minor interruptions caused as each appliance is tested.
Jul 28, 11:25 AEST
Oct 8, 2025
Completed - The scheduled maintenance has been completed.
Oct 8, 17:10 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 8, 12:40 AEDT
Scheduled - The lift in Building A at Cranbourne campus will be unavailable from 12:30pm to 5:00pm Wednesday 8 October to allow for scheduled maintenance works.
Oct 8, 12:34 AEDT
Oct 7, 2025
Completed - The scheduled maintenance has been completed.
Oct 7, 15:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 7, 07:01 AEDT
Scheduled - Electrical Test and Tagging will be undertaken in Building J at Frankston campus from 7:00am to 3:30pm, Tuesday 7 October. Contractors will be making their way through the building during this time, there may be minor interruptions caused as each appliance is tested.
Jul 28, 11:17 AEST
Completed - The scheduled maintenance has been completed.
Oct 7, 15:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 7, 07:00 AEDT
Scheduled - Electrical Test and Tagging will be undertaken in Building T at Frankston campus from 7:00am to 3:30pm, Tuesday 7 October. Contractors will be making their way through the building during this time, there may be minor interruptions caused as each appliance is tested.
Jul 28, 11:24 AEST
Oct 6, 2025
Completed - The scheduled maintenance has been completed.
Oct 6, 17:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 4, 07:00 AEST
Scheduled - Dandenong Tech School works will be taking place from 7:00am Saturday 4 October to 4:00pm Sunday 5 October. The following changes will be in place:
- Gate 2 (Stud Road) and Gate 6 (Cleeland Street) will be closed
- The car park between Buildings A, C and P, and the Oswald Street car park will be closed
- Pedestrian paths between Buildings A, C and P will be unavailable. Please access these buildings via the south side of the campus
- There will be no access to the Executive car park during this time.

Maps outlining the changes to car parks and roadways are available on the Intranet via the home page.
If you have any questions about the construction works taking place at Dandenong campus, please reach out to majorprojects@chisholm.edu.au.

Sep 16, 14:52 AEST
Completed - The scheduled maintenance has been completed.
Oct 6, 15:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 6, 07:00 AEDT
Scheduled - Electrical Test and Tagging will be undertaken in Building S at Frankston campus from 7:00am to 3:30pm, Monday 6 October. Contractors will be making their way through the building during this time, there may be minor interruptions caused as each appliance is tested.
Jul 28, 11:23 AEST
Oct 5, 2025

No incidents reported.